This complete service repair workshop manual PDF download for the Komatsu SK714-5, SK815-5 & SK815-5 turbo Skid-Steer Loader has easy to read text sections with top quality diagrams, pictures and illustrations. The step by step instructions show you how to fault find or complete any repair or overhaul, correctly and efficiently, saving time and avoiding costly mistakes. All specifications and tolerances are listed. Functions of components and systems are also explained.
APPLICABLE MODELS :
Komatsu SK714-5 Skid-Steer Loader
Serial Numbers : 37AF00004 and up
Komatsu SK815-5 Skid-Steer Loader
Serial Numbers : 37BF00006 and up
Komatsu SK815-5 turbo Skid-Steer Loader
Serial Numbers : 37BTF00003 and up
TABLE OF CONTENTS :
- STRUCTURE AND FUNCTION
- TESTING AND ADJUSTING
- DISASSEMBLY AND ASSEMBLY
- MAINTENANCE STANDARD
MANUAL SPECIFICATION :
File Format : PDF
Language : English
Bookmarked : Yes
Searchable : Yes
Printable : Yes
Product Code : WEBM005600
Total Pages : 248
This manual has been prepared as an aid to improve the quality of repairs by giving the serviceman an accurate understanding of the product and by showing him the correct way to perform repairs and make judgements. Make sure you understand the contents of this manual and use it to full effect at every opportunity. This is a must for the Do-It-Yourselfer! Saving Yourself $$$$$$ In Service Repair And Maintenance Costs !!!!
This service repair workshop manual PDF download contains specs, diagrams, actual real photo illustrations, and schemes. In addition to space savings, nice thing about having completly searcheble PDF files instead of a hard-printed manual is that you can use the Search feature in your PDF reader software (Adobe Acrobat) to find just what your looking for and just print out the exact pages you need or all manual easily. This is the same Repair Service manual your local dealer will use when doing a repair.
Instant Download means there is NO shipping costs or waiting for a CD or paper manual to arrive in the mail! You will receive this manual TODAY via Instant Download on completion of payment via our secure payment processor. We accept ALL major credit/debit cards/paypal.
-
COVER
CONTENTS
SAFETY
FOREWORD
- HOW TO READ THE SHOP MANUAL
- HOISTING INSTRUCTIONS
- STANDARD TIGHTENING TORQUE
- COATING MATERIALS
- WEIGHT TABLE
- TABLE OF OIL AND COOLANT QUANTITIES
- CONVERSION TABLE
10 STRUCTURE AND FUNCTION
- P.T.O.
- POWER TRAIN
- TRANSMISSION
- FINAL DRIVE
- HYDRAULIC CIRCUIT SK714-5
- HYDRAULIC CIRCUIT SK815-5 - SK815-5 TURBO
- HYDRAULIC PUMP
- CONTROL VALVE (3-SPOOL)
- CONTROL VALVE (4-SPOOL)
- CLSS
- SOLENOID VALVE
- ACCUMULATOR
- PATTERN CHANGE VALVE
- R.H. PPC VALVE (STANDARD)
- R.H. PPC VALVE PATTERN CHANGE
- L.H. PPC VALVE (STANDARD)
- L.H. PPC VALVE PATTERN CHANGE
- CYLINDERS
- ELECTRICAL DIAGRAM (ENGINE LINE)
- ELECTRICAL DIAGRAM (FRAME LINE STANDARD)
- ELECTRICAL DIAGRAM (FRAME LINE OPTIONAL)
- ELECTRICAL DIAGRAM (CABIN LINE STANDARD)
- ELECTRICAL DIAGRAM (CABIN LINE OPTIONAL)
- ELECTRICAL DIAGRAM (TOP-CABIN LIGHT LINE)
20 TESTING AND ADJUSTMENTS
- NORMAL OR STANDARD TECHNICAL DATA
- SPECIAL TOOLS
- CHECKING THE ENGINE SPEED
- ADJUSTMENT OF VALVE CLEARANCE
- MEASUREMENT OF THE COMPRESSION
- CONTROL AND ADJUSTMENT OF THE FAN BELT TENSION
- CONTROL AND ADJUSTMENT OF THE INJECTION TIMING
- CHECKING ENGINE OIL PRESSURE
- ADJUSTING THE STROKE OF THE ACCELERATOR CABLES
- REGULATION OF PPC VALVES' DRIVE PRESSURE
- ADJUSTMENT OF THE PPC VALVE CLEARANCES
- ADJUSTING THE POSITION OF THE SERVO-CONTROL ENGAGEMENT SAFETY SENSOR
- TESTING AND ADJUSTMENT OF GEARING CHAIN TENSION
- CONTROL AND REGULATION OF THE PRESSURES IN HYDRAULIC CIRCUITS
- TESTING THE HYDRAULIC PUMP
- VALVE CALIBRATION
- CHECKING THE TRAVEL DEVIATION
- CONTROL VALVE
- CONTROL AND REGULATION OF THE SURVO-CONTROL POWER SUPPLY
- ELIMINATION OF RESIDUAL PRESSURES - PRESSURIZATION OF THE TANK
- BLEEDING AIR FROM THE HYDRAULIC CIRCUITS
30 REMOVAL AND INSTALLATION
- HOW TO READ THE MANUAL
- PRECAUTIONS TO BE TAKEN WHILE WORKING
- ENGINE HOOD
- - REMOVAL AND INSTALLATION
- CAB
- - TILTING
- - LOWERING
- BATTERY
- - REMOVAL AND INSTALLATION
- STARTING MOTOR
- - REMOVAL AND INSTALLATION
- ALTERNATOR
- - REMOVAL AND INSTALLATION
- MUFFLER (SK714-5 SK815-5)
- - REMOVAL AND INSTALLATION
- MUFFLER (SK815-5) TURBO
- - REMOVAL AND INSTALLATION
- TURBOCHARGER (SK815-5 TURBO)
- - REMOVAL
- - INSTALLATION
- AIR INTAKE FILTER
- - REMOVAL AND INSTALLATION
- NOZZLE HOLDER
- - REMOVAL AND INSTALLATION
- INJECTION PUMP
- - REMOVAL
- - INSTALLATION
- CYLINDER HEAD (SK714-5 SK815-5)
- - REMOVAL
- - INSTALLATION
- CYLINDER HEAD (SK815-5 TURBO)
- - REMOVAL
- - INSTALLATION
- COOLANT LIQUID PUMP
- - REMOVAL AND INSTALLATION
- RADIATOR GROUP
- - REMOVAL
- - INSTALLATION
- FUEL TANK (SK714-5 SK815-5)
- - REMOVAL AND INSTALLATION
- FUEL TANK (SK815-5 TURBO)
- - REMOVAL
- - INSTALLATION
- CAB
- - REMOVAL
- - INSTALLATION
- ENGINE-PUMP GROUP
- - REMOVAL
- - INSTALLATION
- COMPLETE HYDRAULIC PUMP
- - REMOVAL
- - INSTALLATION
- GEAR PUMP
- - REMOVAL AND INSTALLATION
- ENGINE-PUMP COUPLING
- - REMOVAL AND INSTALLATION
- CONTROL VALVE
- - REMOVAL AND INSTALLATION
- PPC VALVES
- - REMOVAL AND INSTALLATION
- HUB WHEEL
- - REMOVAL
- - INSTALLATION
- - DISMANTLING
- - ASSEMBLY
- FINAL DRIVE
- - REMOVAL
- - INSTALLATION
- RAISING CYLINDER
- - REMOVAL AND INSTALLATION
- BUCKET CYLINDER
- - REMOVAL
- - INSTALLATION
- WORK EQUIPMENT CYLINDERS
- - DISASSEMBLY
- - ASSEMBLY
- COMPLETE WORKING EQUIPMENT
- - REMOVAL
- - INSTALLATION
- WORKING EQUIPMENT SUPPORT FRAME
- - REMOVAL AND INSTALLATION
40 STANDARD MAINTENANCE
- P.T.O.
- TRANSMISSION
- FINAL DRIVE
- HYDRAULIC PUMP
- CONTROL VALVE
- R.H. PPC VALVE
- L.H. PPC VALVE
- PATTERN CHANGE VALVE
- CYLINDERS
- WORKING EQUIPMENT
-